Potable Water Supply | Cobram/Strathmerton, Victoria
Client: Goulburn Valley Water
Contract Type: New water main infrastructure
Value: $1.8m
This project saw NL Drainage undertake a contract to complete a new water main – a 16km section of pipeline 2kms of 250ml DICL was installed through the township of Cobram; 13kms of 250mm; there was also 1km of poly pipeline which required boring under various channels and roadways. Consequently, the township of Strathmerton was able to access potable drinking water as prior to the completion of this project water had been trucked to the town.
The installation was successfully completed within 6mnths (inside the contract period) and on budget.