Contact

mail@gemini-theme.com
+ 001 0231 123 32

Follow

Info

All demo content is for sample purposes only, intended to represent a live site. Please use the RocketLauncher to install an equivalent of the demo, all images will be replaced with sample images.

 
 
 
 
 
 
 

Sewerage Pump Station, Storage Tank and Sewer Rising Main | Tatura, Victoria

Client: HM Prison Dhurringile
Value: $ 1m

NL Drainage was awarded a contract to install a 7m deep pump station and emergency storage vessel, and 6.5kms of 100mm sewer rising main. The pipeline was constructed using a method trenching and directional drilling. There were numerous bores under roadways, channels and sensitive environmental areas. The project took eight weeks from start to completion with NL Drainage also being responsible for the construction, survey, set out and as constructed drawings. Construction of the new infrastructure enabled the prison to expand its (accommodation) operations and having the water and sewerage pumped to the Tatura Sewerage Farm.

Contact Us

Brad Wereszczuk
Managing Director
Mob: 0407 801 714
brad@nldrainage.com.au  

OFFICE: 23-43 Cussen Street
(03) 5897 7290
Tatura  Victoria 3616

ACN: 95 007242364

Business Hours

Mon - Fri 7:00am - 6:00pm
Sat - Sunday Closed

Administration
louise@nldrainage.com.au 
Office: (03) 5897 7290
Mob: 0407 262 195
or admin@nldrainage.com.au 

 


TA Winner logo